Auburns’ client was running a camp facility for large scale oil & gas projects since a long time with a water supply by truck deliveries due to difficiculties in getting a water connection from ADDC.
Every project manager is familiar with this type of supply and well aware that it is high in cost and can cause unwanted supply interruptions.
After Auburn was consulted for this project, the team immediately took action.
Engineering drawings were prepared and all necessary ADDC approvals obtained.
Within 6 weeks after the first consultation the client was able to open his tab directly from the ADDC water supply.