Thinking about your new ADDC Power & Water Supply project – Auburn is here to build it for you.
MAKE THE MATH
To run your site or facility on generators is costly, noisy and unreliable. The earlier you get connected temporary to the grid, the more cost – saving will be achieved.
OUR FULL-SERVICE PACKAGE IN DETAIL
Engineering of low voltage and medium voltage cable drawings for ADDC approval
Gathering of required documents for ADDC approval
Obtaining and follow-up on approvals Supply of low voltage and high voltage switchgears
Cable laying, cable termination and commissioning
ADDC shutdown and final power-up
COST-EFFECTIVE AND RELIABLE
Usually we get our clients connected within 4 weeks making their live on site a lot easier. We make sure that you get power, so you can focus solely on your construction project
ASK FOR OUR PROVEN TRACK-RECORD IN TEMPORARY POWER SUPPLY FROM ADDC GRID.
Permanent Power Supply
Our service portfolio for permanent power connections includes
Low voltage and medium voltage cable drawings for ADDC approval
Gathering of required documents for ADDC
Obtaining and follow-up on approvals
Supply of low voltage and high voltage switchgears